Lead Paint Risk in Pinedale, AZ

10.3%Pre-1978 Housing
36Pre-1978 Units
348Total Housing Units
LowRisk Level

How Pinedale Compares

Pinedale
10.3%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Pinedale Residents

Most housing in Pinedale was built after 1978 (89.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Pinedale

Get a more detailed risk assessment for a specific address.