Lead Paint Risk in Peach Springs, AZ
41.5%Pre-1978 Housing
146Pre-1978 Units
352Total Housing Units
ElevatedRisk Level
How Peach Springs Compares
What This Means for Peach Springs Residents
Peach Springs has an elevated level of pre-1978 housing (41.5%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Peach Springs
Get a more detailed risk assessment for a specific address.