Lead Paint Risk in Paulden, AZ
7.5%Pre-1978 Housing
169Pre-1978 Units
2,258Total Housing Units
LowRisk Level
How Paulden Compares
What This Means for Paulden Residents
Most housing in Paulden was built after 1978 (92.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Paulden
Get a more detailed risk assessment for a specific address.