Lead Paint Risk in Oro Valley, AZ

10.4%Pre-1978 Housing
2,489Pre-1978 Units
23,997Total Housing Units
LowRisk Level

How Oro Valley Compares

Oro Valley
10.4%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Oro Valley Residents

Most housing in Oro Valley was built after 1978 (89.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Oro Valley

Get a more detailed risk assessment for a specific address.