Lead Paint Risk in Mescal, AZ

9.9%Pre-1978 Housing
77Pre-1978 Units
774Total Housing Units
LowRisk Level

How Mescal Compares

Mescal
9.9%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Mescal Residents

Most housing in Mescal was built after 1978 (90.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Mescal

Get a more detailed risk assessment for a specific address.