Lead Paint Risk in Mescal, AZ
9.9%Pre-1978 Housing
77Pre-1978 Units
774Total Housing Units
LowRisk Level
How Mescal Compares
What This Means for Mescal Residents
Most housing in Mescal was built after 1978 (90.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Mescal
Get a more detailed risk assessment for a specific address.