Lead Paint Risk in Lake Havasu City, AZ

17.6%Pre-1978 Housing
6,228Pre-1978 Units
35,294Total Housing Units
LowRisk Level

How Lake Havasu City Compares

Lake Havasu City
17.6%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Lake Havasu City Residents

Most housing in Lake Havasu City was built after 1978 (82.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Lake Havasu City

Get a more detailed risk assessment for a specific address.