Lead Paint Risk in La Paz Valley, AZ

7.5%Pre-1978 Housing
40Pre-1978 Units
536Total Housing Units
LowRisk Level

How La Paz Valley Compares

La Paz Valley
7.5%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for La Paz Valley Residents

Most housing in La Paz Valley was built after 1978 (92.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in La Paz Valley

Get a more detailed risk assessment for a specific address.