Lead Paint Risk in Jeddito, AZ
15.0%Pre-1978 Housing
18Pre-1978 Units
120Total Housing Units
LowRisk Level
How Jeddito Compares
What This Means for Jeddito Residents
Most housing in Jeddito was built after 1978 (85.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Jeddito
Get a more detailed risk assessment for a specific address.