Lead Paint Risk in Gold Canyon, AZ
2.1%Pre-1978 Housing
162Pre-1978 Units
7,897Total Housing Units
LowRisk Level
How Gold Canyon Compares
What This Means for Gold Canyon Residents
Most housing in Gold Canyon was built after 1978 (97.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Gold Canyon
Get a more detailed risk assessment for a specific address.