Lead Paint Risk in Gilbert, AZ

4.4%Pre-1978 Housing
4,213Pre-1978 Units
94,983Total Housing Units
LowRisk Level

How Gilbert Compares

Gilbert
4.4%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Gilbert Residents

Most housing in Gilbert was built after 1978 (95.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Gilbert

Get a more detailed risk assessment for a specific address.