Lead Paint Risk in Chloride, AZ
15.3%Pre-1978 Housing
24Pre-1978 Units
157Total Housing Units
LowRisk Level
How Chloride Compares
What This Means for Chloride Residents
Most housing in Chloride was built after 1978 (84.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Chloride
Get a more detailed risk assessment for a specific address.