Lead Paint Risk in Catalina, AZ
14.3%Pre-1978 Housing
461Pre-1978 Units
3,215Total Housing Units
LowRisk Level
How Catalina Compares
What This Means for Catalina Residents
Most housing in Catalina was built after 1978 (85.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Catalina
Get a more detailed risk assessment for a specific address.