Lead Paint Risk in Bellemont, AZ

0.0%Pre-1978 Housing
0Pre-1978 Units
691Total Housing Units
LowRisk Level

How Bellemont Compares

Bellemont
0.0%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Bellemont Residents

Most housing in Bellemont was built after 1978 (100.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Bellemont

Get a more detailed risk assessment for a specific address.