Lead Paint Risk in Beaver Dam, AZ

4.9%Pre-1978 Housing
54Pre-1978 Units
1,105Total Housing Units
LowRisk Level

How Beaver Dam Compares

Beaver Dam
4.9%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Beaver Dam Residents

Most housing in Beaver Dam was built after 1978 (95.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Beaver Dam

Get a more detailed risk assessment for a specific address.