Lead Paint Risk in Bagdad, AZ

46.5%Pre-1978 Housing
393Pre-1978 Units
846Total Housing Units
ElevatedRisk Level

How Bagdad Compares

Bagdad
46.5%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Bagdad Residents

Bagdad has an elevated level of pre-1978 housing (46.5%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Bagdad

Get a more detailed risk assessment for a specific address.