Lead Paint Risk in Anthem, AZ
1.5%Pre-1978 Housing
143Pre-1978 Units
9,541Total Housing Units
LowRisk Level
How Anthem Compares
What This Means for Anthem Residents
Most housing in Anthem was built after 1978 (98.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Anthem
Get a more detailed risk assessment for a specific address.