Lead Paint Risk in Tok, AK
14.8%Pre-1978 Housing
118Pre-1978 Units
798Total Housing Units
LowRisk Level
How Tok Compares
What This Means for Tok Residents
Most housing in Tok was built after 1978 (85.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Tok
Get a more detailed risk assessment for a specific address.