Lead Paint Risk in Tanaina, AK
11.5%Pre-1978 Housing
416Pre-1978 Units
3,609Total Housing Units
LowRisk Level
How Tanaina Compares
What This Means for Tanaina Residents
Most housing in Tanaina was built after 1978 (88.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Tanaina
Get a more detailed risk assessment for a specific address.