Lead Paint Risk in Ninilchik, AK

19.1%Pre-1978 Housing
180Pre-1978 Units
942Total Housing Units
LowRisk Level

How Ninilchik Compares

Ninilchik
19.1%!<(MISSING)/span>
Alaska
37.3%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Ninilchik Residents

Most housing in Ninilchik was built after 1978 (80.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Ninilchik

Get a more detailed risk assessment for a specific address.