Lead Paint Risk in Ester, AK
18.9%Pre-1978 Housing
281Pre-1978 Units
1,483Total Housing Units
LowRisk Level
How Ester Compares
What This Means for Ester Residents
Most housing in Ester was built after 1978 (81.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Ester
Get a more detailed risk assessment for a specific address.