Lead Paint Risk in Waverly, AL

46.3%Pre-1978 Housing
69Pre-1978 Units
149Total Housing Units
ElevatedRisk Level

How Waverly Compares

Waverly
46.3%!<(MISSING)/span>
Alabama
42.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Waverly Residents

Waverly has an elevated level of pre-1978 housing (46.3%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Waverly

Get a more detailed risk assessment for a specific address.