Lead Paint Risk in Uriah, AL
13.4%Pre-1978 Housing
19Pre-1978 Units
142Total Housing Units
LowRisk Level
How Uriah Compares
What This Means for Uriah Residents
Most housing in Uriah was built after 1978 (86.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Uriah
Get a more detailed risk assessment for a specific address.