Lead Paint Risk in Thomasville, AL
49.8%Pre-1978 Housing
948Pre-1978 Units
1,902Total Housing Units
ElevatedRisk Level
How Thomasville Compares
What This Means for Thomasville Residents
Thomasville has an elevated level of pre-1978 housing (49.8%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Thomasville
Get a more detailed risk assessment for a specific address.