Lead Paint Risk in Priceville, AL
17.4%Pre-1978 Housing
210Pre-1978 Units
1,205Total Housing Units
LowRisk Level
How Priceville Compares
What This Means for Priceville Residents
Most housing in Priceville was built after 1978 (82.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Priceville
Get a more detailed risk assessment for a specific address.