Lead Paint Risk in Pine Level, AL

18.6%Pre-1978 Housing
322Pre-1978 Units
1,730Total Housing Units
LowRisk Level

How Pine Level Compares

Pine Level
18.6%!<(MISSING)/span>
Alabama
42.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Pine Level Residents

Most housing in Pine Level was built after 1978 (81.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Pine Level

Get a more detailed risk assessment for a specific address.