Lead Paint Risk in McCalla, AL

19.9%Pre-1978 Housing
1,138Pre-1978 Units
5,730Total Housing Units
LowRisk Level

How McCalla Compares

McCalla
19.9%!<(MISSING)/span>
Alabama
42.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for McCalla Residents

Most housing in McCalla was built after 1978 (80.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in McCalla

Get a more detailed risk assessment for a specific address.