Lead Paint Risk in Kimberly, AL

12.8%Pre-1978 Housing
222Pre-1978 Units
1,735Total Housing Units
LowRisk Level

How Kimberly Compares

Kimberly
12.8%!<(MISSING)/span>
Alabama
42.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Kimberly Residents

Most housing in Kimberly was built after 1978 (87.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Kimberly

Get a more detailed risk assessment for a specific address.