Lead Paint Risk in Henagar, AL

56.2%Pre-1978 Housing
508Pre-1978 Units
904Total Housing Units
ElevatedRisk Level

How Henagar Compares

Henagar
56.2%!<(MISSING)/span>
Alabama
42.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Henagar Residents

Henagar has an elevated level of pre-1978 housing (56.2%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Henagar

Get a more detailed risk assessment for a specific address.