Lead Paint Risk in Harvest, AL

6.5%Pre-1978 Housing
165Pre-1978 Units
2,542Total Housing Units
LowRisk Level

How Harvest Compares

Harvest
6.5%!<(MISSING)/span>
Alabama
42.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Harvest Residents

Most housing in Harvest was built after 1978 (93.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Harvest

Get a more detailed risk assessment for a specific address.