Lead Paint Risk in Foley, AL
14.7%Pre-1978 Housing
1,698Pre-1978 Units
11,569Total Housing Units
LowRisk Level
How Foley Compares
What This Means for Foley Residents
Most housing in Foley was built after 1978 (85.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Foley
Get a more detailed risk assessment for a specific address.