Lead Paint Risk in Chelsea, AL
6.0%Pre-1978 Housing
345Pre-1978 Units
5,733Total Housing Units
LowRisk Level
How Chelsea Compares
What This Means for Chelsea Residents
Most housing in Chelsea was built after 1978 (94.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Chelsea
Get a more detailed risk assessment for a specific address.